The Village is making major infrastructure improvements over the next few years, with projects led by the Illinois Department of Transportation (IDOT) and Village funding.
In addition to the large projects listed here, the Village is working on road resurfacing and sidewalk replacement as well as replacing a watermain that serves portions of East Sheridan Place and Sylvan Avenue.
We appreciate the partnership and patience of our entire community as we make these necessary upgrades.
Look HERE for the latest construction project updates.
Look below for a high-level overview of all the projects (past, ongoing, and planned).
|
Phase 1 |
Plan |
|---|---|
|
Phase 2 |
Design |
|
Phase 3 |
Construction |
|
Phase 4 |
Completion |
Pump Station #37 Reconstruction (US-41 & IL-176 Interchange) (March 2025 - May 2027)

What to Expect: IDOT is reconstructing Pump Station #37 as the first phase of a future full reconstruction of the US-41/IL-176 interchange. Construction includes a new pump station building, new storm sewer infrastructure, and improved stormwater conveyance to the Skokie River. Residents should expect periodic lane closures and traffic impacts.
Where: Intersection of US-41 & IL-176
Scope:
- Remove the existing pumps beneath US-41.
- Construct a new pump station building northeast of the intersection.
- Install new storm sewer piping along IL-176 to convey stormwater to the Skokie River.
- Improve long-term drainage and flood resilience at the interchange.
Limits
- Work in northbound lanes of US-41 and on IL-176 from US-41 to the south to the Skokie River.
Budget: $15.5 Million (100% IDOT-funded)
Funding Sources: This project is fully funded and managed by IDOT.
Project Milestones: IDOT included the project in the April 25, 2025 letting.
Current Readiness Level: Phase 3 - Construction
Sheridan Road Resurfacing & ADA Upgrades (June - September 2025)

What to Expect: Fresh pavement and ADA improvements, all managed by IDOT.
Where: Entire Sheridan Rd. in the Village and East Scranton Ave. (Green Bay Rd. to East Center Ave.)
Scope
- The Illinois Department of Transportation (“IDOT”) is planning the resurfacing the entirety of Sheridan Road in the Village plus the portion of East Scranton Avenue from Green Bay Road to East Center Avenue.
- Pedestrian curb ramp (ADA) improvements.
- Replace traffic detection loops at intersection of Green Bay Road and West Scranton Avenue.
- Drainage improvements.
- New crosswalks.
- Repair existing sewer and water infrastructure.
Limits
- West Scranton Avenue from Green Bay Road to Sheridan Road.
- Sheridan Road from the northern Village boundary to East Sheridan Road.
- East Sheridan Road from Sheridan Road to Moffett Road.
Budget: $2.8 Million (100% IDOT-funded)
Funding Sources: This is an IDOT project and will 100% paid and managed by IDOT.
Project Milestones: IDOT has executed a construction contract with Peter Baker & Son to complete the project.
Current Project Readiness: Peter Baker & Son is scheduled to begin in June of 2025.
'Deep Tunnel'/West Scranton Avenue Viaduct Stormwater Improvement Project (Fall 2025 - 2028+)

What to Expect: This multi-phase project is designed to reduce flooding in and around the Scranton Avenue Viaduct by constructing a new stormwater transmission system connecting Lake Michigan to the Village's drainage network.
Where: Lake Michigan (Lillian Dell) to the Scranton Avenue Viaduct
Scope:
- Construct a comprehensive stormwater conveyance system to reduce flooding in the Scranton Avenue Viaduct area.
- Install new storm sewer along Sheridan Road and North Avenue.
- Connect future improvements to the completed North Avenue storm sewer segment.
- Reconstruct North Avenue between Sheridan Road and Moffett Road, including new curb and gutter improvements.
- Improve long-term flood resilience and emergency access through the corridor.
Future Construction Impacts:
Future phases are expected to include:
- Temporary closure of Scranton Avenue between Mawman Avenue and Sheridan Road during roadway reconstruction.
- Posted detour routes utilizing Green Bay Road, Buckley Road, and Sheridan Road.
- Staged reconstruction of North Avenue between Moffett Road and Sheridan Road with one lane maintained and flaggers directing traffic.
Budget: $22 Million, with Phase 1 totaling $5M. The cost is offset by $2.7M from the Lake County Stormwater Management Commission and $750,000 through a federal grant. The remaining funding comes through the Village Stormwater Utility Fund.
Funding Sources: Grant funding has been approved for $3.4M of the total project cost. The Village is actively pursuing additional funding from the State of Illinois and other sources.
Project Milestones:
Phase I, extending from Lake Michigan west to Moffett Road, is substantially complete with only minor punch-list items remaining.
The Village is now advancing planning and preliminary engineering for the next two phases of the project and is pursuing additional grant funding to support construction.
A Public Information Meeting Open House was held on Wednesday, June 24, and residents were able to review project exhibits, ask questions, and provide feedback regarding future phases.
Green Bay Road & Bridge Reconstruction (May 2026-Fall 2027)
As of June 2026, Campanella Construction has begun construction activities.
Recent work includes:
- Utility locating and protection.
- Tree protection installation.
- Stormwater management controls.
- Water service replacements.
- Dust control measures.
- Road milling (completed the week of 6/8).
Traffic management measures currently in place include:
- Reduced speed limits in the East and West Terrace neighborhoods.
- Installation of speed humps.
- Enhanced traffic enforcement by the Lake Bluff Police Department.
- Adjustments to road closures and detours to accommodate school transportation.
Upcoming Work
Over the next several weeks, the contractor will:
- Remove the underlying concrete roadway base.
- Place and compact aggregate roadway base materials.
- Install new storm sewer infrastructure.
- Construct new curbs and gutters.
Construction will proceed from south to north, beginning near West Witchwood Lane and advancing toward West Center Avenue.
Residents should expect temporary block-by-block access restrictions lasting approximately two to three days in active work zones.

What to Expect: A complete reconstruction of Green Bay Road and replacement of the bridge superstructure over the Union Pacific Railroad. Residents should anticipate traffic detours, roadway closures, and periodic access restrictions throughout construction.
Where: Green Bay Road from West Scranton Avenue to the Lake Bluff/Lake Forest border.
Scope:
- Reconstruct Green Bay Road within its existing footprint.
- Repair and upgrade underground utilities.
- Install new stormwater improvements.
- Add new crosswalks at West Witchwood Lane and West Sheridan Place.
- Replace the bridge superstructure over the Union Pacific Railroad.
- Preserve existing roadway geometry, lighting, and as many mature trees as possible.
Limits
- Green Bay Road from West Scranton Ave to the Lake Bluff / Lake Forest border.
Budget: Roadway - $5.2M ($3.9M grant secured through Federal Surface Transportation Program-Shared Fund). Bridge - $2.3M ($1.8M grant anticipated through Federal Surface Transportation Program-Bridge Fund).
Project Milestones: The Village held a Public Open House for the project on November 2, 2023 and July 30, 2025.
Current Readiness Level:
- Roadway: Phase III
- Bridge: Phase I
Green Bay Road Pedestrian Bridge & Trail Improvement Project (2028-2030)

What to Expect: The addition of a pedestrian bridge over the Canadian National Railroad tracks on the west side of Green Bay Road.
Where: West side of Green Bay Road.
Scope
- Add a pedestrian bridge over the Canadian National Railroad tracks on the west side of Green Bay Road.
- Connect existing Village path on the west side of Green Bay Road from Signe Court to the new pedestrian bridge.
- Construct new multi-use path from the new pedestrian bridge to IL-137 in the City of North Chicago.
Limits
- Green Bay Road from Signe Court to IL-137 in the City of North Chicago.
Budget: $4.25M
Funding Sources: The project will be fully funded by a $1.25M allocation from the State of Illinois and a $3M grant that was secured by the Village through the Illinois Transportation Enhancement Program.
Current Readiness Level: Phase 1 Engineering has been completed.
41/176 Interchange (2028-2030)
Scope
- IDOT will reconstruct the interchange of US Highway 41 and Illinois Route 176.
- Add acceleration and deceleration lanes to and from US 41.
- Adjust the elevation of US 41 to increase sight distances.
- Improve intersection to accommodate increased vehicle traffic and reduce confusing operations (turns).
- Widen Skokie Valley Road and Shagbark Road (the L-shaped roads connecting US 41 and IL 176).
- Add additional through and turn lanes on IL 176.
- Extend West Washington Avenue to serve properties northeast of the interchange.
- Improve drainage and construct an area for stormwater detention just northwest of the interchange..
- Improve the intersection of Waukegan Road (Illinois Route 43) and IL 176.
Limits
- US - 41 from approximately 1/2 mile north of IL-176 to approximately 1/4 miles south of IL-176.
- IL-176 from Waukegan Road to the Skokie River.
- Waukegan Road form Woodland Road to Carriage Park Avenue.
Budget: $88 Million
Funding Sources: This is an IDOT project and will be 100% paid and managed by IDOT.
Preferred Improvement Plan
- Overall Plan
- IL Rt. 43 Improvements
- IL Rt. 176 Improvements
- US Rt. 41 Plan Improvements
- Typical Sections
Study Background Materials
- Location Map
- Project Study Area
- Project Development Flow Chart
- Existing Conditions (2010)
- Peak Hour Origin-Destination Study
- Peak Hour Traffic Volumes (2010)
- Morning & Afternoon Peak Hour Traffic Volumes
- Weekend Pedestrian and Bicycle Counts (2010)
- Crash & Injury Types
- Roadway Segment Crashes (2006-2008)
- Intersection Crashes (2006-2008)
- Environmental Resources Inventory
- Draft US 41 at IL 176 Section 4(f) De Minimis Documentation
Project Milestones: A public meeting will be scheduled when the project construction schedule is finalized.
Current Readiness Level: Beginning Phase 2 Final Engineering.
Block 1 Streetscape Improvements (2026)


What to Expect: This project enhances the appearance, walkability, and functionality of the Central Business District through new pavement, wider sidewalks, landscaping, public gathering spaces, and public art.
Where: East Scranton Avenue (Sheridan Road to Walnut Avenue)
Scope:
- Resurface East Scranton Avenue between Sheridan Rd and Walnut Ave
- Maintain two-way traffic and existing south-side parking.
- Expand sidewalks and greenspace on the north side of the street.
- Create a flexible event space through specialized curb design.
- Install enhanced streetscape amenities including seating, lighting, landscaping, and public art.
Limits:
- East Scranton Avenue from Sheridan Road to Walnut Avenue.
Budget: Estimated $930,000.
Funding Sources: Village-funded.
Current Readiness Level: Final improvements concluded in June 2026.
Glen Avenue Footbridge Replacement Project
Brief History
- The existing steel and wooden footbridge that crosses Ravine Park at Glen Avenue was originally constructed in 1915 and was significantly renovated around 1980.
- 2017: An inspection of the bridge showed deterioration in some of the steel members.
- 2019: The Village considered potential repairs to extend the life of the existing bridge.
- 2021: A review of the potential work needed to repair the existing bridge indicated that the cost of repairs would be high enough that the Village should consider replacing the bridge.
- 2022: The Village received a generous $400,000 gift from an anonymous donor to help fund the replacement of the existing bridge.
- 2023: Village Staff worked with nearby property owners and the Village’s Architectural Board of Review to complete the plans for the new bridge and enhancements to the areas on each end of the bridge.
- 2024: Installation of of the Glen Avenue Footbridge and project completion.
Project Milestones: The new bridge was constructed off-site, brought to Lake Bluff in two pieces, and installed by a crane. The bridge is about two feet wider that the previous bridge and is made of steel with wooden decking. Similar to the previous bridge, the new bridge is painted green and has outriggers extending beyond the sides of it. Steel sheet piling was installed in two areas on the south end of the bridge to stabilize the land and provide a space with benches. Native plantings were installed on both ends of the bridge.